How long does it take to change the blades?

The edge of blade is high speed steel welded. Based on our experience, for keeping stable production capacity and crushing edge of flake, we suggest to change the blades every 40 tons production. But in our own plant, we change the blade everyday to get the best cutting efficiency. It normally takes two to three hours to change the whole set of blades.
Back to List